MEP design
Electromechanical studies
Every building over 50 m² needs a set of electromechanical studies before a building permit is issued. MEP systems are the heart of a building and need careful design and faithful execution.

What's included
- Heating and domestic hot water
- Electrical installations
- Water supply and drainage
- Thermal insulation (KENAK)
- Central air conditioning, where required
- Heating cost allocation
- Passive and active fire protection, fire detection
- Lifts, ventilation, pools, lighting
What you gain
Lower consumption
The building is designed from day one to use less energy.
Right materials
Equipment chosen to suit the use and the budget.
Cost control
You know in advance what construction will cost.
Fewer problems
Design and execution by the same team, with no gaps between them.
Questions about this service
When are MEP studies needed?
For every building over 50 m², before the building permit is issued.